DronePortal.app
Built for professional drone operators
Knowledge base · Processing
GCPs lift your mapping from “looks good” to absolutely accurate and repeatable. Without GCPs your model leans on the drone’s GPS; with GCPs you anchor it to real, surveyed coordinates. This guide shows how to prepare your measured points, tie them to your images in the WebODM GCP interface, and process the gcp_list.txt file.

Plan for at least 5 GCP targets that were in view during the flight and that you surveyed one by one (with an RTK rover such as the D-RTK 3, see that guide). You have their coordinates as a CSV from your survey device, and you know the coordinate reference system (CRS) you measured in. Note: the GCP interface in WebODM Lightning requires a paid plan or enough credits.
Your CSV holds a label and X/Y/Z per point. WebODM recognises the columns automatically if you use common names: label (GCP Label, Label, Name), X (Easting, X, Longitude, Lon), Y (Northing, Y, Latitude, Lat) and Z (Elevation, Z, Altitude, Alt). Also look up your EPSG code (for example via epsg.io); it describes your coordinate system.
Open the GCP interface, choose your CSV and type the EPSG code (or a PROJ.4 definition) of your system. Then go to the next step. If the interface does not recognise your EPSG code, paste the PROJ.4 string (found on epsg.io under the export tab). If the map places your points in the wrong spot, you have usually swapped X and Y (Northing/Easting) or chosen the wrong system.
Select a GCP on the map and click Tag, then Browse to load your project images. If your images are georeferenced, the interface sorts them automatically by distance to that point. Click each image exactly on the target; the border turns green. Zoom in with Shift plus scroll wheel, remove a tag with the X, and save with Save Changes. Repeat for each GCP.
Aim for 8 to 12 images per GCP, with a minimum of 3. Beyond 12 the gain is small and accuracy can even suffer. Important: only tag images with a clear view of the target. If trees, buildings or other objects sit between the camera and the point, skip that image, otherwise the reconstruction may fail.
You can designate one or more points as a checkpoint (via the popup on the map). Checkpoints are left out of the computation but serve to check the accuracy of the result. Handy for validating your model. Always keep at least 3 real GCPs for the computation itself.
From the map view, go to the next step, check the data and click Download gcp_list.txt. You upload this file together with your images when creating the task in WebODM. To resume work on a GCP file later, drag gcp_list.txt with the images via “Resume Work on GCP File”.
By default, heights (Z) are read as ellipsoidal height relative to WGS84. If you work with a different vertical datum, specify it with a plus sign: EPSG:<horizontal>+<vertical>, optionally with the geoid in parentheses, for example EPSG:6527+6360(GEOID18).
Do not swap X and Y.
The classic mistake: Northing and Easting reversed, sending your points to the other side of the world. Always check that the map places your GCPs in the right spot.
Right coordinate system.
A wrong EPSG code skews everything, subtly or grossly. Be certain which system you measured in.
Not too many, not too few tags.
8 to 12 images per GCP is the sweet spot; fewer than 3 is unusable, many more is wasted effort and sometimes counterproductive.
Clear view per image.
Do not tag images where an obstacle sits between the camera and the target.
At least 3 for the computation, but plan for more (5 or more) so you can use some as checkpoints and absorb the error margin. Spread them well across the site.
The drone GPS gives relative accuracy, but no reliable absolute position or height. For volume measurements, tracking between datasets or tying to plans, you need GCPs (or an RTK flight with control points).
Use the PROJ.4 definition of your system, found on epsg.io under the export options. Paste that string instead of the code.
Take it into the field
The core of this guide as a tickable checklist on a single A4.
Download the field checklist (PDF) →GCPs are surveyed with an RTK rover, and your accurate model is delivered ready to use to your client.